PRICE LIST OF BUILDING MATERIALS AND FINISHINGS IN LAGOS

If you are still a tenant in Lagos and want to be your own landlord, this is the time to start planning how to build your house.
I want you to know that building a house in Lagos, Nigeria is not as difficult as most people perceive. All you need to build your house are the following:
  •   Buy a Land.
  •   Draw a building plan.
  • Get a builder to give you the total cost of labor and building materials required to complete the building.

PRICE OF BUILDING MATERIAL (OCTOBER, 2014)
SN
MATERIAL
MEASURE
COST IN NAIRA
1
Cement
bags
1,750
2
8mm & 10mm dia.bar (133)
tons
118,000
3
12mm (93) & 16mm (53) dia. Bar
tons
112,000
4
20mm dia. Bar (33)
tons
120,000
5
Binding
rolls
5,000
6
1" ×12" Planks
nos
1300
7
2"×3" timber (bracing)
nos
250
8
Nail (1" 2" 3" 4" 5")
bags
5,000
9
Maring Board
pcs
6000
10
Bamboo
nos
250
11
Line
nos
150
12
DPM(nylon)
rolls
4,500
13
Peg
bundle
600
14
Solignum
gallon
3,000
15
Roofing wood Hardwood (2"×2")
pcs
250
16
Roofing wood Hardwood (2"×3")
pcs
300
17
Roofing wood Hardwood (1"×3")
PCS
470
18
Roofing wood Hardwood (2"×4")
pcs
500
19
Roofing wood Hardwood (3"×4")
pcs
800
20
Roofing wood Hardwood (2"×6")
pcs
700
21
Roofing wd Hardwood (1"×12") Fascia
pcs
1500
22
Roofing wd Hardwood (2"×12"x12")
pcs
2300
23
Tornado or concrete nails
park
350
24
1/4 rod
length
450
25
Sharp sand (20 tons)
trip
38,000
26
Plaster sand (20 tons)
trip
35,000
27
Filling Sand (20 tons)
trip
24,000
28
Granite
(20 tons) trip
110,000
29
Granite
(30 tons) trip
140,000
30
9'' Block
nos
170
31
6'' Block
nos
150




SN
PLUMBING INSTALLATIONS (Piping Material)
MEASURE
COST IN NAIRA
1
4" Pipe
Length
1,500
2
4" Elbow
nos
300
3
4" Tee
nos
450
4
4" bend
nos
300
5
4""×45 bend
nos
280
6
4" Cross Tee
nos
800
7
4" plug
nos
50
8
3" Pipe
Length
1,200
9
3" Elbow
nos
250
10
3" Tee
nos
300
11
3" bend
nos
200
12
3" plug
nos
40
13
2" pipe
Length
650
14
2" Elbow
nos
80
15
2" Tee
nos
135
16
2" bend
nos
100
17
2"×45 bend
nos
80
18
2" plug
nos
30
19
1" pipe
Length
400
20
1" Elbow
nos
35
21
1" Tee
nos
50
22
1"Socket or sleeve
nos
50
23
1" Union connector
nos
150
24
3/2 pipe
length
530
25
3/2 elbow
nos
50
26
3"*2" tee
nos
250
27
3/2 Socket
nos
50
28
Adaptor
nos
50
29
Stop coke
nos
750
30
Vent cover
nos
250
31
5/4 pipe
nos
470
32
1"×3/4" Bushing
nos
30
33
1/2" Male/Female Socket
nos
30
34
1/2" Male/Female Elbow
nos
30
35
1/2"Male/Female Niple
nos
30
36
Floor drain
nos
450


Second Stage


1
3/4 Pipe
pcs
350
2
3/4 Elbow
pcs
30
3
3/4 Tee
pcs
35
4
3/4 Socket
pcs
35
5
3/4 Cork
pcs
600
6
3/4 Adaptor
pcs
50
7
3/4 Union connector
pcs
80
8
1/2 Pipe
pcs
200
9
1/2 Elbow
pcs
30
10
1/2 Tee
pcs
30
11
1/2 Socket
pcs
30
12
1/2 Adaptor
pcs
30
13
1/2 Stop cork
pcs
500
14
1/2 Union connector
pcs
50
15
1×3/4 Elbow
pcs
50
16
3/4 ×1/2 Elbow
pcs
30
17
1×3/4 Socket
pcs
35
18
Tread tape
nos
150





HOTWATER PIPE (COPPER)


1
Copper pipe
pcs
3000
2
Copper elbow
pcs
150
3
Copper tee
pcs
150
4
Copper socket
pcs
100
5
Copper F/M
pcs
100
6
Gasket gum
pcs
200
7
Abro gum
pcs
1700
8
Putty gum (small)
pcs
50
9
Putty gum (big)
pcs
500
10
Topgit Gum
pcs
1300
11
Yarn
pcs
150
SN
ELECTRICAL INSTALLATIONS (Conduiting)
MATERIALS
COST IN NAIRA
1
20mm PVC pipe
Bundle
2,500
2
25mm PVC pipe
Bundle
3,200
3
D4 single phase board
packet
5,500
4
D6 single phase board
packet
6,500
5
D8 single phase board
packet
14,000
6
D4 three phase board
packet
12,500
7
D6 three phase board
packet
15,000
8
D8 three phase board
packet
18,500
9
20mm coupler
packet
600
10
25mm Coupler
packet
900
11
20mm Male bush
packet
600
12
25mm Male bush
packet
900
13
3×3 Iron & Patriel box (England)
packet
400
15
3×6 Iron & Patriel box (England)
packet
450
16
20mm U, Y, Looping, End or Through box
packet
700
17
20mm 4 waybox
packet
900
18
4×4 Adaptable box
packet
300
19
6×6 Adaptable box
packet
450
20
6×9 Adaptable box
packet
700
21
Tangit gum (small)
pcs
250
22
Tangit gum (medium)
pcs
500
23
Tangit gum (big)
pcs
1,300
24
Cooker unit box
pcs
600
25
20mm Bending Spring
pcs
250
26
25mm Spring
pcs
280
27
Earthing rod
pcs
1,500
The builder will go and come back with a long list of inflated prices of building materials that might discourage you. But hope is not lost. Below is the current price list of building materials (excluding finishing) in Lagos, which you can use to prepare the costing.

Stay in touch as the cost of these materials will be discussed in the next articles.Building finishing includes Roofing, window & door fixing, Electrical and Plumbing fittings, POP, Painting and Tiling.